Data Center Construction Built to Last
The leader in general engineering and concrete services, Joseph J. Albanese Family Holdings, Inc. delivers proven Data Center concrete success.
Functioning as a prime contractor and/or as a sub-contractor, we deliver multi-scope capabilities with the experience and expertise to get the job done safely and efficiently.
Your Best Choice for Data Center Projects:
Benefits of Working With Our Team
We Function as Your Prime Contractor and/or Sub-Contractor
We Provide a Single Source for
Multiple Capabilities
We Have the
Skilled Manpower
We Own Our
Own Equipment
We Get It Done Safely
We Are Technologically Advanced


“We build data centers faster and more efficiently than anyone in the business. We have proven success meeting tight deadlines by doing whatever it takes to get the job done safely.”
— Alexis Susnow, Project Executive, Joseph J. Albanese, Inc.
At Joseph J. Albanese Family Holdings, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.
Featured Projects
Bay Area Data Center
Bay Area, California
Client: Confidential
Services:
Highlights:
-
Built interior space to house computers and support front offices
-
Poured over 169,000 cubic yards of concrete
-
17,000 cubic yards of Rough Grade
-
22,000 cubic yards of Bioswale Installation
-
112,000 cubic yards Import/Place Fill
-
17,000 cubic yards of Structural Concrete
-
1,000 cubic yards Site Concrete
-
Built 215,000 square feet of Building Pad
-
Built 85 Tilt Panels


Hayward Data Center
Hayward, California
Client: Devcon Construction
Services:
Highlights:
-
Demolished 600,000+ square feet of existing structures
-
242,000 square feet of asphaltic concrete
-
168,000 square feet of slab on grade
-
210,000 square feet of buildings
-
Rough-graded 9,000 cubic yards, crushed 12,000 tons of concrete on-site, and paved 3,800 tons
-
Conducted structural excavation of 13,000 cubic yards
-
Built 7,100 linear feet of foundation formwork and 11,000 cubic yards of foundations
-
Built 5,700 cubic yards of mat slab
-
Built 204,000 square feet of slab on deck
-
Built 24,000 square feet of sidewalks and 8,200 linear feet of curbs
Santa Clara Data Center
Santa Clara, California
Client: Turner Construction
Services:
Highlights:
-
Provided a single source for multiple capabilities
-
Implemented pre-construction planning to maximize success
-
Delivered exceptional communication with the general contractor
-
Coordinated efficiently with other subcontractors
-
Worked around tight timelines to meet city noise restrictions
-
Delivered safe and on-time completion


San Jose Data Center
San Jose, California
Client: Devcon Construction
Services:
-
Structural Excavation for the foundation
-
Structural Concrete for foundations, building and generator yards
Highlights:
-
Pre-construction planning with the office and field
-
Efficient coordination with the general contractor
-
Coordination with other sub-contractors
Santa Clara Data Center
Santa Clara, California
Client: Holder Construction Company
Services:
Highlights:
-
Performed structural excavation during the rainy winter season, including stabilization of the bottom of excavations based on ground water level
-
Poured approximately 17,000 cubic yards of concrete
-
Proposed and executed an effective solution that included installing a rat slab at all excavations to prevent cave-ins and safety hazards.
-
Ensured that all slabs met specified FF/FL tolerance
-
Installed 340 anchor bolts correctly and within tolerance
-
Implemented detailed planning to ensure each step of construction was handled with quality and excellence
-
Developed a solid working relationship with the general contractor team to cover multiple scopes of the project
-
Facilitated excellent communication with the General Contractor and field teams
-
Provided a single source for multiple capabilities
-
Delivered solid pre-construction planning to ensure smooth execution
-
Utilized Virtual Construction to digitally build the project prior to construction


Silicon Valley Data Center
Silicon Valley, California
Client: Confidential
Services:
Highlights:
-
Performed a very large amount of concrete work on this 16-acre project, including:
-
26,400 cubic yards of concrete poured to date
-
240,000 square feet of slab on grade poured to date
-
640,000 square feet of slab on metal deck poured to date
-
130,000 square feet of topping slab poured to date
-
Worked around unique construction challenges, including shared foundations between three of the structures onsite and having grade beam reinforcement from one building run through a pile cap of the neighboring building
-
Delivered consistent high-quality concrete on an accelerated schedule with limited space on site
-
Implemented detailed planning to ensure each step of construction was handled with quality and excellence
-
Developed a solid working relationship with the general contractor team cover multiple scopes on the project
-
Facilitated excellent communication with the General Contractor and field teams
-
Provided a single source for multiple capabilities
-
Delivered solid pre-construction planning to ensure smooth execution
-
Utilized Virtual Construction to digitally build the project prior to construction
Project Gallery