top of page
JJA_Family Holdings_4x-100.png
DJI_20260723123646_0032_V.JPG

Tilt-Up Concrete

JJA Dog Logo

Tilt-Up Concrete, Done Right

Ideal for Data Centers and More

Joseph J. Albanese Family Holdings, Inc. delivers advanced tilt-up concrete solutions designed for construction speed, strength and long-term performance. Panels are cast on-site, cured, and then lifted into place for maximum efficiency and structural integrity.

Jimmy Soto_2.jpg

"Whether it’s for a building, wall or walkway, we create interesting finishes in a variety of colors and textures to fit your structure’s unique design."

— Jimmy Soto, Structural Superintendent, Joseph J. Albanese Inc. 

Ideal for mission-critical environments such as data centers and large industrial builds, using tilt-up concrete means shorter schedules and lower labor costs, delivering a highly durable, energy-efficient performance from day one.

Project Gallery

Structural Concrete1.jpg

Our Experience
Over the Last Three Years

380,000 linear feet Curb & Gutter

19,250 linear feet Bioswale Curb

1,625,000 square feet Flat Work

27,750 square feet Pervious

580,000 square feet City Flatwork

110,000 square feet Driveway

500,000 square feet Vehicular Driveway

300,000 square feet Slubsab

57,500 linear feet Site Walls

Early 2000s_Demolitiion.jpg

Joseph J. Albanese Family Holdings, Inc., delivers multi-scope capabilities from demolition and excavation to grading, paving, structure and site concrete. Through proactive and flexible coordination with general contractors and other project stakeholders, our team gets it done safely while focusing on the successful delivery of every project’s objective.  

Data Center

Hayward, California 

Client: HITT Contracting

Services: 

 

  • Performed multi-scope capabilities, including Grading & PavingStructural ConcreteSite ConcreteConcrete PumpingSawcutting and Virtual Construction

  • Provided a keen understanding of the scope of work across four buildings, keeping value and scope of work separate for each phase

  • Installed anchor channels into the top of the 24-inch mat slab, flush with the top of the concrete, to enable data servers to slide across the floor from one side of the building to the other (rails were also installed on multiple building floors)

  • Solved many challenges, including finding a way to install anchor channels into the 24-inch mat slab with supports so that it is flush with the concrete

  • Built the loading dock, generator pads and more


Highlights:

 

  • Provided a single source for multiple capabilities 

  • Implemented pre-construction planning to maximize success

  • Delivered exceptional communication with the general contractor 

  • Coordinated efficiently with the other subcontractors 

  • Ensured that the equipment was on-site and on-time despite weather issues 

  • Stayed on schedule for on-time completion of various phases

 

Picture1.png

Tell us about your upcoming project.

bottom of page