Coleman Highline Office Park

Coleman Highline Office Park

Joseph J Albanese Dog Logo

Trusted Partner for Complicated Office Campus Construction

Joseph J. Albanese, Inc. is a leader in construction of office parks. For the new Coleman Highline project, which provides a lifestyle of amenities, including kitchens, fitness centers, courtyards and sport courts, the team successfully provided multiple capabilities from a single source.

“Despite an unusually cold, wet winter, our concrete crews delivered extensive concrete work with intricate finishes on time. Our clients know they can count on us to get the job done right every time.”

— Brandon Maack, Project Manager

Joseph J. Albanese Family Holdings, Inc.

At Joseph J. Albanese Family Holdings, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.

Coleman Highline Office Park

San Jose, California

Client: 

Devcon Construction

Services:

  • Delivered concrete capabilities, including Demolition, Excavation, Structural Concrete, Site Concrete, Concrete Pumping, and Sawcutting and Core Drilling

  • Performed excavation of soil up to eight-feet deep and time treated nearly 200,000 square feet of building pads

  • Moved 100,000+ cubic yards of dirt on-site to create access and building pads

  • Poured 750,000+ square feet of slabs and slabs on metal deck

  • Poured and finished 60,000+ square feet of site concrete, including concrete walkways, bridges, planters and bocci court

  • Implemented city improvements, including building new streets and widening existing streets as well as constructed two+ miles of vertical curb and gutter and 145,000 square feet of sidewalks, vehicular paving and top-cast and top-seeded architectural flatwork graded and rocked

  • Placed 12,000+ tons of asphalt concrete

  • Built new access roads to nearby Avaya Stadium so the project site could be blocked off while providing safe and efficient access to the stadium

Highlights:

  • Provided a single source for multiple capabilities

  • Delivered exceptional communication with the general contractor

  • Provided solid coordination with other subcontractors

  • Ensured that the equipment was on-site and on-time despite weather issues

  • Helped keep the site accessible and operational throughout the seasons

  • Stayed on schedule for both early and on-time completion of various phases