Stanford Recreation & Wellness Building

Joseph J Albanese Dog Logo

Joseph J. Albanese, Inc. Concurrently Constructs Nine-Story Stanford Recreation & Wellness Building and Parking Structure 

Before any concrete was placed, the team performed demolition and mass excavation to remove approximately 35,000 cubic yards of earth. From there, they poured approximately 30,000 cubic yards of concrete over 150 pours, installed a three-foot mat slab over 55,000 square feet and performed concrete work of 60,000 square feet for slabs across the building’s nine floors. Getting it done, safely.

Project Video: Medical Office Building
Jeff Alves_1.jpg

“Concurrently constructing a nine-story office building and a parking structure makes this a really unique project. We were dialed in with relentless and deliberate execution, all with an unwavering dedication to safety.”

— Jeff Alves, Project Manager, Joseph J. Albanese, Inc.

"At Joseph J. Albanese, Inc. we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted in bringing the highest level of quality to every project we do for our clients."

Stanford Recreation & Wellness Center and Parking Structure
Redwood City, California

Client: Level 10 Construction

Services: 

 


Highlights:

 

  • Performed mass excavation of about 35,000 cubic yards of earth

  • Poured approximately 30,000 cubic yards of concrete over 150 pours

  • Installed three-foot mat slab over 55,000 square feet

  • Performed concrete work of 60,000 square feet for slabs across nine floors

  • Provided a single source for multiple capabilities 

  • Facilitated excellent communication with the General Contractor and field teams

  • Provided solid pre-construction planning to ensure smooth execution

  • Utilized Virtual Construction to digitally build the project prior to construction