Monterey Bay Sanctuary Scenic Trail

Joseph J Albanese Dog Logo

Joseph J. Albanese, Inc. Brought to Life the Monterey Bay Sanctuary Scenic Trail Segment 5 as Prime Contractor on Its First Federal Public Works Project

For the 7.29-mile long Monterey Bay Sanctuary Scenic Trail that runs along the mountainous Santa Cruz coastline, the team converted a dirt path into a beautiful paved trail. This project’s capabilities range from excavation and slope stabilization, including 36 culverts and 13 water line replacements, to site concrete, shotcrete and paving. The new trail provides safe access to the scenic coastline and to nearby State Parks and beaches. Getting it done, safely.

Project Video: Monterey Trail
MELINDA_BERGE_01.jpg

“We always take great pride in working toward delivering the highest quality product possible. Since the trail is here in our own backyard, we are especially excited about this project.”

— Melinda Berge, Senior Project Manager & Quality Control Manager,

Joseph J. Albanese, Inc.

"At Joseph J. Albanese, Inc. we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted in bringing the highest level of quality to every project we do for our clients."

Monterey Bay Sanctuary Scenic Trail 
Santa Cruz, California

Client:     Federal Highway Administration

              Santa Cruz Regional Transportation Committee (landowner)

Services: 

 


Highlights:

 

  • Performed as the prime contractor and quality control manager for our company’s largest prime contract and first federal project

  • Developed a 7.29-mile cycling and pedestrian trail with 8,890 TN of asphalt and 42,000 cubic yards of fill. 

  • Shored up the coastline with 36 culverts and 13 new waterlines

  • Built two parking lots including restrooms

  • Provided multiple GPS stations to help guide the excavation and construction

  • Coordinated with key stakeholders, including the Regional Transportation Committee, the Federal Highway Administration, Caltrans, State Parks and local businesses 

  • Facilitated smooth coordination with the farmers who lease farms near the trail from the State Park to ensure that construction is successful without impacting the farms

  • Delivered the highest possible quality work while carefully preserving the natural terrain

  • Implemented a comprehensive plan to ensure the safety of cyclists, pedestrians and everyone using and working on the trail during construction

  • Provided a single source for multiple capabilities 

  • Delivered solid pre-construction planning to ensure smooth execution

  • Utilized Virtual Construction to digitally build the project prior to construction