Stanford University Bridge Research Building

Complex Office Building Project Supported by Advanced Virtual Construction
Joseph J. Albanese, Inc. is a leader in the construction of office buildings. For the new Stanford University Bridge Research Building project, a complex structural building with high-end site architectural finishes, the team successfully provided multiple capabilities from a single source.

For this extremely complex project during an unprecedented rainy year, we provided excavation, structural concrete and site concrete. Using Virtual Construction we first constructed the project virtually to ensure a smooth construction in real life.
— Cameron Ragain, Project Manager
Allied Concrete, A Joseph J. Albanese Company
At Joseph J. Albanese Family Holdings, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.
Stanford University Bridge Office Park
Palo Alto, California
Client:
Whiting-Turner
Services:
Delivered concrete capabilities, including Excavation, Structural Concrete and Site Concrete
Created a hybrid suspended slab-on-slab on metal deck system to connect two buildings that cohesively act as one while sharing a below-grade basement
Poured concrete slabs for the foundation and basement-level slabs
Will provide high-end architectural finishes when project is near completion
Highlights:
Provided a single source for multiple capabilities
Delivered exceptional communication with the general contractor
Provided solid pre-construction planning to ensure smooth execution
Utilized Virtual Construction to digitally build the project prior to construction
Employed Building Information Modeling (BIM) in the field to ensure precision
Delivered exceptional coordination with other subcontractors
Ensured that all equipment was on-site and on-time despite weather issues
Kept project on schedule through extremely rainy winter during spring months