Data Center

Joseph J Albanese Dog Logo

Experienced Team Delivers Safe and On-Time Data Center Construction

Joseph J. Albanese, Inc. is the leader in building data centers safely, quickly and efficiently. Our extensive pre-construction planning and on-site coordination ensures that the job goes smoothly and that your data center is up and running as quickly as possible.

“Despite an unusually cold, wet winter, our concrete crews delivered extensive concrete work with intricate finishes on time. Our clients know they can count on us to get the job done right every time.”

Jonny Hoang, Project Manager, Joseph J. Albanese, Inc.

At Joseph J. Albanese, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.

Data Center

Santa Clara, California

Client: 

Turner Construction

Services:

  • Performed multi-scope capabilities, including Demolition, Grading & Paving, Structural Concrete, Site Concrete, Shotcrete, Concrete PumpingSawcutting & Core Drilling and Virtual Construction

  • Accommodated special city requirement for asphalt concrete mix, which calls for a rubberized asphalt mix to reduce traffic noise 

  • Installed anchor channels into the top of the 24-inch mat slab, flush with the top of the concrete, to enable data servers to slide across the floor from one side of the building to the other (rails were also installed on multiple building floors)

  • Solved many challenges, including finding a way to wet-set anchor channels into the 24-inch mat slab with supports so it is flush with the concrete

  • Installed curbs, gutters, asphalt and concrete pads

  • Built the loading dock, generator pads and more

Highlights:

  • Provided a single source for multiple capabilities 

  • Implemented pre-construction planning to maximize success

  • Delivered exceptional communication with the general contractor 

  • Coordinated efficiently with other subcontractors 

  • Worked around tight timelines to meet city noise restrictions 

  • Delivered safe and on-time completion 

Data Center